Problem migrating database with over 100 tables
Posted by: Bill C
Date: January 23, 2006 07:51PM

I cannot migrate an Oracle 8.1.5 db that has over 200 tables. If I cancel the Reverse Engineering step before the process hits the 100 table, I can migrate the tables. If I allow the Reverse Engineering Process to go past the 100th table then the Object Selection screen is blank and the migration process is stopped.

Has anyone else experienced this issue?

Options: ReplyQuote